The line went down. The fix is in Mike’s head. Mike retires in June.

Capture what your experts know — in minutes, not memos — and put it to work on every shift, at every site.

Solutions Manufacturing Know How Activation. Guided session on a phone — gloved operator, step view

Shift variance

Best-shift performance, every shift.

Retiring cohorts

Knowledge retention at exit — before the exit.

Audit exposure

Evidence a procedure was followed as written.

You’ve already tried the usual answers

The wiki went stale in year one. The exit-interview knowledge dump captured a fraction of thirty years. The “shadow Mike” plan transfers what Mike remembers to say, not what Mike does. And the SOP binder is current, complete, and three hundred feet from the machine.

The knowledge exists. It’s just not where the work is.

Knowledge work activation

From Mike’s head to every shift

01

Capture

A voice note after the fix. A screen recording during the changeover. Mike talks; DeemL structures. Fifteen minutes, not a documentation project.

02

Context

The knowledge attaches to the line, the machine, the product variant — so the next operator sees Mike’s judgment exactly where Mike would have applied it.

03

Assist

Guided sessions at the point of work: the steps, the decision points, the “here’s why” — on a phone, with gloves on.

Solution Manufacturing Worker Guiding

Meets your floor where it runs

MES events trigger guidance. CMMS work orders arrive with the know-how attached. Your identity provider governs access. DeemL joins the systems that run your operation — it doesn’t ask them to move.

Integrations

Where do you sit?

I run operations

Start with the six-question fit check.

Find your shape

I own training & development

See what guided ramp-up looks like.

Book a demo

I own quality or safety

See governed, verified procedures.

See how governance works

“New hires are confident on the floor in 3 weeks instead of 3 months. DeemL turned our tribal knowledge into a system everyone can access.”

Training Director

Industrial Manufacturing


June is coming.

Start free and capture your first procedure this week — or take the six-question fit check and we’ll tell you honestly what shape of deployment you need.